EIA Law Matrix

Australia – NSW
EIA Procedure
Projects Requiring EIA: Government projects, Private projects
Abridged Assessments: N/A
Best Practices in Lieu of EIA: N/A
Who Conducts Screening: N/A
Who Prepares EIA: N/A
Who Pays for EIA: N/A
EIA Contractor Qualifications: No
EIA Contractor Qualifications Detail: No
Conflict of Interest: Yes
Terms of Reference: N/A
Automatic Approval: N/A
Written Decision: Yes
Written Decision Detail: The consent authority must notify its decision to the applicant, any person who made submissions and any other person required in the regulations (s81(a) EPA). The notification must contain the information as set out in reg. 100 (EPAR). Although a requirement of writing is not mentioned, it may be inferred from the extensive requirements of notification. A consent authority that has not determined the application within the relevant period is taken to have refused consent (s82(1) EPA). The relevant period is 60 days for designated development, unless the submission period runs for longer then 30 days (reg 113(1)(b)(ii)).
Authority to Impose Conditions: Yes
Authority to Impose Conditions Detail: YES: a consent authority may determine a development application by granting consent subject to conditions. Section 80A governs the imposition of conditions
Financial Assurances or Bond: No
EIA Content
Interdisciplinary Team: N/A
Range of Alternatives: Yes
Range of Alternatives Detail: Sch 2, cl 72(3) EPAR: An analysis of any feasible alternatives to the carrying out of the development or activity, having regard to its objectives, including the consequences of not carrying out the development or activity
No Action Alternative: Yes
No Action Alternative Detail: See above, must consider the consequence of not carrying out the activity (EPAR sch2 cl 72(3))
Mitigation: Yes
Mitigation Detail: YES: an EIS must include of the measures proposed to mitigate any adverse environmental affects (sch 2 pt 5 EPAR).
Monitoring Plans: Yes
Monitoring Plans Detail: In relation to major projects of state environmental planning significance (Pt 3A EPA), a Minister may place conditions on a project requiring monitoring or environmental audits (s122C EPA).
Access to Information
Public Notice of Draft EIA: N/A
Draft EIA Available: N/A
Public Notice of Final EIA: Yes
Public Notice of Final EIA Detail: YES: As soon as practicable after the development application is made, the development application (including EIS) must go on public exhibit and notice must be displayed clearly at the location of the proposed development (reg 79(1) EPAR) and published on two separate occasions in the newspaper (reg 80 EPAR). The Notice must state that the application and EIS may be inspected at designated places (reg 79(1)(e)(iv) EPAR).
Final EIA Available: Yes
Final EIA Available Detail: YES: EIS are available to inspect at the public exhibition and are available by sale from the determining authority (reg 75 EPAR)
Fee to View EIA Documents: N/A
Availability of Reference Studies: N/A
Public Notice of Final Decision: Yes
Public Notice of Final Decision Detail: Yes
Public Participation
Public Scopingtigation: No
Public Scoping Detail: No Mention
Public Review of TOR: Yes
Public Meetings: N/A
Public Input at Meeting: N/A
Public Comments on Draft EIA: N/A
Public Comments on Final EIA: At least 30 days from the date of notice (s79(1)(a) EPA)
Response to Public Comments: No
Response to Public Comments Detail: NO Mention: Following the submission period, the consent authority must forward all submission to the Director-General (reg 81 EPAR) and cannot make a determination until 21 days after the submissions have been forwarded (s80(9)(b) EPA). In determining a development application, the Authority must take into consideration any submissions (s79C(1)(d) EPA).
Facilitation of Public Participation: No
Judicial Review/Enforcement
Citizen Administrative Review: No
Citizen Judicial Review: Yes
Citizen Judicial Review Detail: A person that has made a submission by way of objection under s79(5), may appeal to the court within 28 days of receiving notice (s81(3) EPA) of the decision (s98 EPA)
Project Monitoring: No
Project Monitoring Detail: No
Enforceability of EIA: N/A
Enforceability of Permit: N/A